ALUCOBOND Blog

All Categories Awards Case Studies Company News Educational Facilities From the Experts Guest Blogs Hospitals In the Press Let's Talk Tech Pre-fab Prefabrication

Regal Cinema

Alucobond, Regal Cinema, Ohio

Project Name: Regal Cinema
Project Location: Crocker Park, Ohio
ALUCOBOND PLUS Materials: 3,000 sq. ft. of  4mm Silver Metallic
Year of Installation: 2005
Architect: Bialosky + Partners, Cleveland, OH
Fabricator: Royalton Architectural Fabrication Inc., North Royalton, OH
Installer: Carroll Glass & Maintenance Co., Cleveland, OH
Attachment Method: Royaltech 3000 dry joint rain screen system

Cinema Marquee Shines and Relates

The cinema marquee at the Regal Cinema in Crocker Park, OH, (reference Westlake, OH) shines with its neon and lighted signage reflecting off its tasteful, sophisticated terraced tower of Alucobond® composite metal panels. The marquee was designed to be “reminiscent of the Art Deco style of the 1920s and ’30s,” according to Paul Deutsch, AIA, Principal of Bialosky + Partners Architects of Cleveland, Ohio. The marquee draws attention, and movie fans, to the cinema as a diverse mix of other materials — including stucco, GRC (glass fiber reinforced cement), brick, and glass – add to the building’s visual interest. Retail storefronts in Crocker Park are designed to the needs of each tenant, while the overall design aesthetic results in “an exciting urban street level experience.”

Alucobond, Regal Cinema, Ohio

As the architectural firm for the development itself, Bialosky + Partners further describes the project: “Crocker Park is a major mixed use development dedicated to the principles of new urbanism. It is located in a suburban setting on a 75-acre site. The project objectives were to create a new city center, oriented around a main street, in a highly urban setting. The project incorporates ground floor retail and commercial in a main-street environment with upper-story residential and office space. This development encompasses 1.75 million sq. ft. and includes over 600 residential units.”

Alucobond, Regal Cinema, Ohio

Approximately 3,000 sq. ft. of Alucobond Material, 4mm thickness, was utilized by the metal panel fabricator, Royalton Architectural Fabrication Inc. of North Royalton, OH, as part of the Royaltech 3000 dry joint – rain screen system. The Alucobond Material features a Kynar 3-coat Silver Metallic finish. Material was installed by Carroll Glass & Maintenance Co., Cleveland, OH.

This entry was posted in Case Studies. Bookmark the permalink. Follow any comments here with the RSS feed for this post.

Colors Used

Silver Metallic

Tags: