3A Composites USA will be focused on creating identity from the inside out with its full lines of interior rigid substrates and exterior aluminum composite materials at GlobalShop 2017 to be held March 28-30 in Las Vegas.
3A Composites USA will be focused on creating identity from the inside out with its full lines of interior rigid substrates and exterior aluminum composite materials at GlobalShop 2017 to be held March 28-30 in Las Vegas.
Project Name: | Lincoln Park Centre |
---|---|
Project Location: | Chicago, Illinois |
Alucobond Materials: | Alucobond® Plus NaturAL Brushed Stainless |
Architect: | Weiss Architects |
Fabricator: | Sobotec Ltd. |
Installer: | Architectural Panel Systems, Inc. |
General Contractor: | Ernie Loberg Construction |
Photography: | Paul Biasco and Architectural Panel Systems |
Lincoln Park Centre – a 61,000-square-foot retail shopping center located at the highly trafficked intersection of North and Clybourn avenues on Chicago’s north side – has undergone the kind of major changes in just a few short years that have made it a real-estate investment company’s dream venture.
Project Name: | The Connor Group Headquarters |
---|---|
Project Location: | Miamisburg, Ohio |
Alucobond Materials: | Alucobond NaturAL Brushed Finish |
Architect: | Moody Nolan |
Fabricator: | Royalton Architectural Fabrication, Inc. |
Installer: | Celina Glass Co., Inc. |
General Contractor: | Messer Construction Co. |
Photography: | Brad Feinknopf Photography & Daniel Lunghi (see copyright under photo) |
Executives at The Connor Group set high expectations for design of the national real-estate investment firm’s new Central Support Office building, which opened in Miamisburg, Ohio, in August 2014.