ALUCOBOND Blog | aluminum composite material | Page 9

All Categories Awards Case Studies Company News Educational Facilities From the Experts Guest Blogs Hospitals In the Press Let's Talk Tech Pre-fab Prefabrication

NERCC, the Boston Carpenters Training Center and the Union’s Vision Center

Project Name: Boston Carpenters Training Center
Project Location: Boston, Massachusetts
Alucobond Materials: 10,500 sq ft 4mm Custom Copper Metallic
10,500 sq ft 4mm Carpenters Mica
22,000 sq ft 4mm Custom Pewter Creek
Year of Installation: 2010
Architect: ADD INC, Boston
Fabricator/Installer: Sunrise Erectors, Inc.
General Contractor: Suffolk Construction Co., Inc.
Images: Robert Umenhofer

The New England Council of Carpenters (NERCC) has represented the interests of its members for more than 130 years.  While a long-standing regional presence, this traditional organization based in Boston also embraces modern goals for its membership of 22,000 carpenters in six New England states.  So, when the new home of NERCC and the Boston Carpenters Training Center was designed, it was important to organization leaders that it be comprised of both traditional and modern architectural influences.

Alucobond NaturAL Meets Unique Design Twist At Sustainable 2010 Winter Olympic Village

Project Name: Southeast False Creek Olympic Village
Project Location: Vancouver, British Columbia, Canada
Alucobond Materials: 77,000 sq ft 4mm Alucobond naturAL Brushed
Year of Installation: 2009
Architect: Nick Milkovich Architects
Fabricator/Installer: Keith Panel Systems Co., Ltd.Vancouver, British Columbia, Canada
General Contractor: ITC Construction GroupVancouver, British Columbia, Canada
Images: Keith Panel Systems, Nick Milkovich Architects, Michael Elkan

Three architectural firms were challenged by the Vancouver Organizing Committee to design Millennium Water:  The Southeast False Creek Olympic Village in Vancouver, British Columbia, Canada, for its first use as a temporary home for many of the 2,600 athletes from 82 nations competing in the 2010 Winter Olympics. (The Olympic Games were held Feb. 12-28, 2010, in venues located throughout Greater Vancouver, as well as in the resort town of Whistler, British Columbia, where additional athletes were hosted.)  More permanently, Millennium Water was designed as a sustainable mixed-use residential and commercial community, incorporating not only environmental sustainability but social and economic sustainability goals as well.

Minnetonka Schools

Project Name: Minnetonka Schools
Project Location: Minnetonka, Minnesota
Alucobond Materials: 5,359 sq ft of 4mm custom Arabian Blue
4,385 sq ft of 4mm Platinum Mica
Attachment Method: Rout and Return Wet Seal
Year of Installation: 2009
Architect: ATS&R Planners/Architects/Engineers, Minneapolis
Fabricator/Installer: Innovative Building Concepts, Inc.Bloomington, Minn.
General Contractor: Merrimac Construction Co., Inc.Bethel, Minn.

SCHOOLS’ NEW WELCOMING, SECURE ENTRYWAYS FINISHED WITH ALUCOBOND® ACM

The Minnetonka, Minn., High School is considered the flagship of Minnetonka Public School District #276, which serves approximately 8,400 students in grades K-12 in this suburban community located just eight miles west of Minneapolis in Hennepin County.  As such, it was the first among the district’s schools to receive a facelift completed in January 2009 that included a secure entry and office space within a two-story beacon-like rotunda.

Tempe, Ariz. Transportation Center

Project Name: Tempe, Arizona Transportation Center
Project Location: Tempe, Arizona
Alucobond Materials: 8,300 sq ft of4mm Spectra Green
7,700 sq ft of4mm Platinum
Year of Installation: 2008
Architect: Otak – Lake Oswego, Oregon
Architekton – Tempe, Arizona
Fabricator: Elward Systems Corp., Lakewood, Colo.
Installer: Elward Construction Co., Tempe, Arizona

Alucobond® Spectra ACM Helps Create Sparkling, Sustainable Gem at Tempe, Ariz. Transportation Center

City of Tempe, Ariz., architects and engineers are no strangers to sustainable building design. The $46.8 million East Valley Bus Operations & Maintenance Facility, which is owned and operated by the Arizona cities of Tempe and Scottsdale and Valley Metro, achieved two Leadership in Energy and Environmental Design (LEED) Gold certifications from the U.S. Green Building Council following its summer 2007 opening.

Benicia-Martinez, CA Toll Plaza

Project Name: Benicia-Martinez, CA Toll Plaza
Project Location: Benicia-Martinez, California
Alucobond Materials: 55,000 Ft of 4mm Copper Metallic
6,000 Ft of 4mm Shimmering Teal
Year of Installation: 2007
Architect: David Stow, CalTrans
Attachment Method: Rout and Return Dry Seal
Fabricator: CSP Architectural Metals
San Ramon, CA
Installer: C/S Erectors, Inc.
San Ramon, CA

When the new $1.2 billion Benicia-Martinez, Calif., Bridge project was set to open in late-August 2007, it wasn’t the 1.6 mile long, five-lane bridge spanning the Carquinez Strait between Contra Costa and Solano counties that garnered coverage from The San Francisco Chronicle on its www.SFGate.com web site last August 23. It was the Benicia-Martinez toll plaza. 

Plaza Midtown, Atlanta

Project Name: Plaza Midtown, Atlanta
Project Location: Atlanta, Georgia
Alucobond Materials: 53,000 sq. ft. 4mm Alucobond Plus Material
Silver Metallic
Year of Installation: 2006
Architect: Smallwood, Reynolds, Stewart, Stewart & Associates, Inc., Atlanta
Fabricator/Installer: The Miller Clapperton Partnership, Austell, Georgia
Attachment Method: MCP System 100

Alucobond® Plus Material Gleams at Plaza Midtown

Opened in early 2006, The Plaza Midtown in Atlanta is a mixed-use development featuring residential condominiums in two 20-story towers, and 70,000 sq. ft. of neighborhood retail. The gleaming twin towers of Silver Metallic Alucobond® Plus Material and glass are located on a 3.3-acre site that covers an entire city block, from Eighth St. to Peachtree Place between Spring and West Peachtree Streets. Directly accessible to the I-75/I-85 connector, this is part of a dynamic area with market growth that is drawing urban professionals and development.