Project Name: | Rush University Medical Center |
---|---|
Project Location: | Chicago, Illinois |
Alucobond Materials: | 250,000 sq. ft. custom Spinnaker Bone White 17,000 sq. ft. custom Sunstorm Rum Pewter |
Year of Installation: | 2011 |
Architect: | Perkins+Will, Chicago |
Fabricator: | Sobotec Ltd., Hamilton, Ontario |
Installer: | ASI Ltd. (Previously of Whitestown, Ind.) |
General Contractor: | Powers/Jacob Joint Venture, Chicago |
Images: | Robert R. Gigliotti |
The new 14-story $654-million hospital building at Rush University Medical Center in Chicago, which is referred to as The Tower, stands out on the city’s skyline with a unique butterfly design and striking white exterior – both visual symbols of the medical center’s goal to transform healthcare delivery. Formable Alucobond® Plus aluminum composite material in the custom Spinnaker Bone White color was selected to realize the hospital’s shining, clean exterior image and its unique butterfly design.