Project Name: | Benicia-Martinez, CA Toll Plaza |
---|---|
Project Location: | Benicia-Martinez, California |
Alucobond Materials: | 55,000 Ft of 4mm Copper Metallic 6,000 Ft of 4mm Shimmering Teal |
Year of Installation: | 2007 |
Architect: | David Stow, CalTrans |
Attachment Method: | Rout and Return Dry Seal |
Fabricator: | CSP Architectural Metals San Ramon, CA |
Installer: | C/S Erectors, Inc. San Ramon, CA |
When the new $1.2 billion Benicia-Martinez, Calif., Bridge project was set to open in late-August 2007, it wasn’t the 1.6 mile long, five-lane bridge spanning the Carquinez Strait between Contra Costa and Solano counties that garnered coverage from The San Francisco Chronicle on its www.SFGate.com web site last August 23. It was the Benicia-Martinez toll plaza.