Project Name: |
Minnetonka Schools |
Project Location: |
Minnetonka, Minnesota |
Alucobond Materials: |
5,359 sq ft of 4mm custom Arabian Blue
4,385 sq ft of 4mm Platinum Mica |
Attachment Method: |
Rout and Return Wet Seal |
Year of Installation: |
2009 |
Architect: |
ATS&R Planners/Architects/Engineers, Minneapolis |
Fabricator/Installer: |
Innovative Building Concepts, Inc.Bloomington, Minn. |
General Contractor: |
Merrimac Construction Co., Inc.Bethel, Minn. |
SCHOOLS’ NEW WELCOMING, SECURE ENTRYWAYS FINISHED WITH ALUCOBOND® ACM
The Minnetonka, Minn., High School is considered the flagship of Minnetonka Public School District #276, which serves approximately 8,400 students in grades K-12 in this suburban community located just eight miles west of Minneapolis in Hennepin County. As such, it was the first among the district’s schools to receive a facelift completed in January 2009 that included a secure entry and office space within a two-story beacon-like rotunda.